Alaa Al TamimiPossible Reasons why Buildings Collapse
khalid Al TatanchiRisk Based Thinking in ISO 9001 Quality Management System
khalid Al TatanchiCost of Quality: The balance between the quality of the provided service and the required costs to provide it
Alaa Al Tamimiالاحتباس الحراري والخطر العالمي القادم
Wael AlwaeliMulti-level nonlinear modeling verification scheme of RC high-rise wall buildings
Wael AlwaeliRigorous versus less-demanding fragility relations for RC high-rise buildings
Wael AlwaeliA Methodology For Defining Seismic Scenario-Structure-Based Limit State Criteria For RC High-rise Wall Buildings Using Net Drift
Alaa Al Tamimiمدينة في المريخ خلال هذا القرن
Mustafa AlmukhtarAwareness for the Necessity of the Pre-Soil Investigation
Alaa Al Tamimiمُستقبلٌ بدون استخدام طاقة نووية؟